Total Tower

Lagos, Nigeria, 2017

Technical Specifications

Type

tertiary - housing

Location

Lagos, Nigeria

client

Total / EKO

project manager

Architecture: enia architectes 
Engineering: Iosis international 

Project manager: Gianni Modolo
Assistants: Graciela Zaffari, Nathalie Odiot, Stéphanie Principaud 

area

35 000 m²

cost

90 M€ ex-Tax

Program

Construction of a Guest House including: a medical center, a building complex (with 100 rooms), restaurants, lobbies and a business center.

Mission

Full mission

Status

completed

Date

2017

The programme is composed of five different, programmatic entities, located in a smaller site with numerous urban planning constraints:

  • A Guesthouse with all the rooms.

  • A social and medical center with various users (Guesthouse users and external users specifically coming to the center)

  • Intermediate programmes (restaurants and bars with kitchens, a conference center, a health club and outdoor sports areas)

The merging of these programmatic elements in two vertical volumes creates a façade hierarchy simplifying the building’s readability. The use of a simple geometry guarantees the durability of the structure. In fact, a high volumetric complexity inescapably creates weaknesses.

Sea atmosphere, saline mist and air pollution require the use of materials that don’t suffer from corrosion in order to ensure sustainability. The choice of exposed and fiber-reinforced concrete such as DUCTAL is pertinent in such a hostile environment.

The project’s architectural and technical composition meet the following environmental objectives:

  • Reducing the energy needs, especially for air conditioning, while keeping an optimum comfort for the visitors,

  • Reducing drinkable water consumption,

  • Optimization of waste management, including medical waste, in the view to anticipate the sorting policy in the city of Lagos.